EPLAN Cable proD
Key Facts
- Determine cable lengths early on The routing path and thus the length of the cable is determined on the digital model of the machine during the engineering phase, meaning that the space required for cabling has already been determined at this early stage of the process.
- Include different disciplines The requirements for the electrical engineering are visualised in the MCAD model, thereby ensuring that the cables can be installed as planned.
- Secure planning Early coordination between mechanical and electrical engineering allows for good planning, meaning that any “unpleasant surprises” – like those due to errors that are only first recognised in assembly – are a thing of the past.
Categories
- Optimisation
- Engineering
- Design, planning
Key Facts
- Determine cable lengths early on The routing path and thus the length of the cable is determined on the digital model of the machine during the engineering phase, meaning that the space required for cabling has already been determined at this early stage of the process.
- Include different disciplines The requirements for the electrical engineering are visualised in the MCAD model, thereby ensuring that the cables can be installed as planned.
- Secure planning Early coordination between mechanical and electrical engineering allows for good planning, meaning that any “unpleasant surprises” – like those due to errors that are only first recognised in assembly – are a thing of the past.